Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Skip to content
Simio background artwork

Simio Aerospace – Fall 2024

DATE

August 2024

Summary

Simio Aerospace, a manufacturer of commercial airliners, is evaluating planned changes to their final assembly systems. Their process line has multiple workstations, each with a statement of work consisting of 5 to 20 aggregated tasks. Each task has unique requirements for labor, tools and material handling. The current system is schedule driven, so any work not completed at the time the line pulses will be “traveled” downstream since airplanes simply go from one location to the next according to the cycle time, regardless of whether all the work is finished by the specified time. Evaluating alternative production policies regarding this traveled work is objective for this case study. The manufacturing process is labor-intensive, and Work in Process (WIP) is costly. Therefore, process improvement in the areas of labor productivity and reduction of WIP is critical.

Additional Details

Develop a Simio model that uses Task Sequences to implement the work requirements for each plane at each of the five work cells. Assume that planes can only move out of a work cell when the tasks for that cell are complete (i.e., no traveled work). Use this model to analyze the following cases:

  1. Where there is no space for planes between work cells (i.e., zero capacity input and output buffers)
  2. Where there is space for one plane between work cells
  3. Where there is space for unlimited planes between work cells
  4. Where each work cell can work on up to two planes simultaneously (i.e., capacity = 2) and there is no space for planes between work cells.

Your analysis should consider the following metrics:

  • Cycle time (defined as the time between successive plane completions – the inter-departure time).
  • Completion time for the batch – initially 75 planes, and when the SA103 is introduced, 100 planes.
  • Workforce utilization
  • WIP
  • Blocking and starving at each work cell